
In the dying days of Joe Biden’s presidency, he warned that the race to build artificial intelligence data centres must not trample on the green energy transition.
In a January 2025 executive order, the former US president mandated that any developer selected to build on government lands should bring online enough clean energy generation to match their power needs.
您已閱讀9%(493字),剩余91%(5127字)包含更多重要信息,訂閱以繼續探索完整內容,并享受更多專屬服務。